A roof replacement is a significant home improvement project that can seem overwhelming. Understanding what to expect during the process helps you prepare your home, manage your schedule, and ensure the project goes smoothly. This guide walks you through the complete roof replacement process, from preparation to completion, so you know exactly what to expect each day.
Pre-Installation Preparation
Before work begins, your roofer will prepare:
Material Delivery
- Materials are typically delivered 1-2 days before installation begins
- Materials are staged in your driveway or yard
- Dumpster is delivered for old roofing disposal
Home Preparation
You should prepare your home:
- Move vehicles from driveway
- Clear yard of outdoor furniture and decorations
- Cover or move items in attic that might be affected by vibration
- Inform neighbors about the project
- Ensure access to your property
Permits and Inspections
- Your roofer should have obtained necessary permits
- Initial inspections may be scheduled
Day 1: Removal and Preparation
The first day typically involves removal of old roofing:
What Happens
- Old roofing materials are removed
- Roof deck is exposed and inspected
- Any damaged decking is repaired or replaced
- Debris is removed and disposed of
What to Expect
- Noise: Significant noise from removal work
- Vibration: Your home will experience vibration
- Debris: Some debris may fall (roofer should protect your property)
- Duration: Typically 4-8 hours depending on roof size
What You Should Do
- Be available for questions
- Keep pets and children indoors
- Expect some disruption
Day 2-3: Underlayment and Installation
Installation of new roofing begins:
What Happens
- Underlayment is installed
- New roofing materials are installed
- Flashing is installed around penetrations
- Edge details are completed
What to Expect
- Progress: Visible progress each day
- Noise: Continued noise from installation
- Crew: Crew will be on your roof most of the day
- Duration: Typically 2-4 days depending on roof size and complexity
What You Should Do
- Continue normal activities (with some noise tolerance)
- Be available if roofer has questions
- Inspect progress if desired (safely from ground)
Final Day: Completion and Cleanup
The final day involves finishing touches and cleanup:
What Happens
- Final installation details completed
- Ridge caps installed
- Final flashing and seals completed
- Complete cleanup of job site
- Dumpster removal
- Final inspection (if required)
What to Expect
- Cleanup: Complete removal of all debris
- Inspection: Final walkthrough with roofer
- Documentation: Receipt of warranties and documentation
What You Should Do
- Participate in final walkthrough
- Ask any questions
- Review warranties and documentation
- Verify cleanup is complete
Timeline Variations
Actual timelines vary based on several factors:
Roof Size
- Small roofs (1,000-1,500 sq ft): 1-2 days
- Medium roofs (1,500-2,500 sq ft): 2-3 days
- Large roofs (2,500+ sq ft): 3-5 days
Complexity
- Simple roofs: Faster completion
- Complex roofs (multiple levels, valleys, dormers): Longer completion
- Steep pitches: May take longer
Weather
- Good weather: Project proceeds on schedule
- Rain or high winds: Delays installation
- Your roofer should communicate delays
Material Type
- Some materials install faster than others
- Complex materials may take longer
Your roofer should provide a realistic timeline based on your specific project.
What to Expect: Noise and Disruption
Roof replacement involves significant noise and disruption:
Noise Levels
- Significant noise during removal and installation
- Loudest during old roof removal
- Moderate noise during installation
- Typically 7 AM - 5 PM work hours
Vibration
- Your home will experience vibration
- Most noticeable during removal
- Items in attic may shift
Access
- Crew needs access to your property
- Driveway may be blocked by materials
- Yard may have equipment
Minimizing Disruption
- Plan work or meetings around the project
- Consider staying elsewhere if very sensitive to noise
- Communicate special needs with your roofer
Safety and Protection
Your roofer should protect your property:
Property Protection
- Tarps or protection for landscaping
- Protection for windows and doors
- Coverage for outdoor items
Safety Measures
- Safety equipment for crew
- Proper fall protection
- Warning signs if needed
What You Should Do
- Keep pets and children away from work area
- Don't approach work area during installation
- Follow roofer's safety instructions
Communication and Questions
Good communication ensures a smooth project:
Daily Updates
- Your roofer should provide daily progress updates
- Communicate any delays or issues
- Answer your questions promptly
Questions to Ask
- What's the timeline for each phase?
- What should I expect each day?
- How will you protect my property?
- What if weather delays the project?
- When will cleanup be complete?
Issues or Concerns
- Address concerns immediately
- Don't wait until project completion
- Document any problems with photos
RIF-certified roofers maintain clear communication throughout the project.
Frequently Asked Questions
How long does a roof replacement take?
Most residential roof replacements take 2-5 days depending on roof size, complexity, and weather. Small, simple roofs may take 1-2 days, while large or complex roofs may take 3-5 days. Your roofer should provide a realistic timeline based on your specific project.
Will I need to leave my home during roof replacement?
Typically no, you don't need to leave your home. However, there will be significant noise and vibration. If you're very sensitive to noise or have special circumstances, you might consider staying elsewhere. Most homeowners stay and tolerate the temporary disruption.
What happens if it rains during roof replacement?
If rain occurs during installation, your roofer should cover exposed areas with tarps. Work may be delayed until weather improves. Your roofer should communicate delays and protect your home from water damage. Most roofers plan for potential weather delays.
How much noise should I expect?
Roof replacement involves significant noise, especially during old roof removal. Noise is typically loudest on the first day. Work hours are usually 7 AM - 5 PM. The noise is temporary and necessary for the installation process.
What should I do to prepare my home?
Prepare by: moving vehicles from driveway, clearing yard of outdoor items, covering or moving items in attic that might be affected by vibration, informing neighbors, and ensuring access to your property. Your roofer should provide specific preparation instructions.